Below this frame you can see some of the latest projects that we have done, Drywall Repair, Drywall Patches, Drywall Retexture, Drywall Taping, Interior Painting, Faux Painting, Popcorn Ceiling Removal, Steel Stud Framing, Acoustical Ceilings, around Summit County like Keystone, Dillon, Silverthorne, Frisco, Breckenridge and some places in Eagle County like Vail, Avon, Edwards, Etc.





 

Next you can see a slideshow of the process of doing a complete log cabin re-texture including catedral ceilings, bathrooms, bedrooms, kitchen, closets, etc.








Next you can see a slideshow of the process of doing a water damage repair from taking off the damaged drywall, insulation, drying it, etc. to leaving it like it was before the damage happen.








Next you can see a slideshow of the process of doing Popcorn Ceiling Removal, Re-texture and Paint in a Condominium.








Next you can see a slideshow of the process of doing ceiling re-texture, drywall installation, tape and texture.








Next you can see a slideshow of the process of doing Wallpaper Removal and complete Re-texture from Orange Peel to Skip Trowel / Hand Texture and Paint in a Condominium.








Next you can see a slideshow of the process of doing Steel Stud Framing Ceiling in a Condominium with Concrete Ceilings.








In the left a Ceiling after Popcorn Texture Removal and Skim Coat and in the right the Skip Trowel Texture is done, ready for Primer and Paint.


A picture in the left showing a ceiling after the popcorn ceiling have been removed
A picture in the right showing a ceiling after the skip trowel texture is done, ready for primer and paint.




In the left a Ceiling after Popcorn Texture Removal and Skim Coat and in the right a close up picture to show the Skip Trowel Texture, ready for Primer and Paint.


A picture in the left showing a ceiling after the popcorn ceiling have been removed
A picture in the right showing a ceiling after the skip trowel texture is done, ready for primer and paint.




In the left Resilient Channel is installed in a basement to help with noise transmission and in the right Walls and Ceilings are ready for Primer and Paint.


A picture in the left showing resilient channel installed in a basement for sound transmission purposes
A picture in the right showing a basement after the drywall installation, tape and texture is done ready for primer and paint.




In the left Popcorn Removal is being done and in the right after Drywall Skim Coat, New Texture, Primer and Paint are done looking like new.


A picture in the left showing popcorn removal being done in a condominium
A picture in the right showing a condominium after the Skim Coat, New Texture, Primer and Pain are done looking like new.




In the left closing the loft with Steel Stud Framing and in the right after Drywall Installation, Tape and Texture, ready for Primer and Paint.


A picture in the left showing a loft being closed using steel stud framing
A picture in the right showing a loft after the drywall installation, tape and texture done, ready for primer and paint




In the left drywall is been installed on top of the old one for soundproofing and in the right ceiling and walls are ready for primer and paint.


A picture in the left showing a condominium where drywall is been installed for soundproofing purposes
A picture in the right showing a condominium after the texture is done in ceilings and walls ready for primer and paint




In the left drywall is been installed to cover the popcorn ceiling and in the right the ceiling and walls are already painted.


A picture in the left showing a condominium where drywall is been installed to cover the popcorn texture
A picture in the right showing a condominium after the paint in ceilings and walls is done




In the left after popcorn ceiling removal and in the right after the texture is done ready for primer and paint.


A picture in the left showing a condominium where the popcorn texture have been removed
A picture in the right showing a condominium after the texture was done ready for primer and paint.




In the left popcorn ceiling is been covered and in the right after the paint is done.


A picture in the left showing a condominium where the popcorn ceiling is been covered
A picture in the right showing a condominium after the texture was done and painted.




In the left after the drywall have been installed and in right after the texture ready for primer and paint.


A picture in the left showing a condominium after the drywall have been installed
A picture in the right showing a condominium after the texture was done ready for primer and paint.




In the left after removal of Popcorn from ceilings and wood from the walls and in the right after it have been re-textured and painted.


A picture in the left showing a condominium after Popcorn from ceilings and wood from the walls have been removed.
A picture in the right showing a condominium after it have been re-textured and painted.




In the left drywall installation in a house and in the right after the skip trowel / hand texture is done ready for paint.


A picture in the left showing drywall installation in a house.
A picture in the right showing a house after the skip trowel / hand texture is done ready for paint.




In the left a garage after a water damage repair with new insulation and in the right after it have been painted.


A picture in the left a garage after a water damage with new insulation
A picture in the right showing a garage after it have been painted




In the left A condominium showing a newly framed closet with steel studs and in the right after it has been textured ready for paint.


A picture in the left showing a newly framed closet with steel studs
A picture in the right showing a closet after it have been textured ready for paint




In the left a complete comdominium it's been re-textured from orange peel to skip trowel / hand texture and in the right is ready to prime and paint.


A picture in the left showing a leaving room being re-textured with a skip trowel / hand texture.
A picture in the right showing a leaving room with a skip trowel / hand texture ready to prime and paint.




In the left a condominium before a complete re-texture and in the right the re-texture is been done using a skip trowel / hand texture.


A picture in the left showing a condominium before a complete re-texture.
A picture in the right showing a condominium after it was done using a skip trowel / hand texture.




In the left after the popcorn ceiling have been removed and in the right showing a new skip trowel drywall texture, ready to paint.


A picture in the left showing a ceiling after the popcorn ceiling have been removed.
A picture in the right showing the ceiling after its been textured using a skip trowel drywall texture ready to paint.




In the left a leaving room with popcorn texture and a mirror inside the wall, in the right the popcorn is off, the mirror was replaced with drywall and showing a fresh coat of paint.


In the left a picture showing a leaving room with popcorn texture and a mirror inside the wall.
in the right picture you can see that the mirror is was replaced with drywall, the popcorn texture is gone and is 
showing a fresh coat of paint.




In the left a ceiling showing a lot of stress cracks due to setting down, in the right after the cracks have been repaired looking brand new ready to paint.


A picture in the left showing a ceiling with a lot of stress cracks
A picture in the right showing the ceiling after its been textured ready to paint.




In the left popcorn ceiling being covered with drywall compound to apply a new texture, In the right the texture and new paint are done looking brand new.


In the left picture you can see acoustical ceiling being covered with
drywall compound.
in the right picture you can see after the skip trowel drywall texture and paint
are done.




In the left a cathedral ceiling after the acoustical ceiling have been removed and in the right showing a brand new orange peel texture ready to paint.


A picture in the left showing a catedral ceiling after the acoustical ceiling
removal is done.
A picture in the right showing a ceiling after the orange peel drywall texture
is done.




In the left a remodel, a kitchen and hallway after the acoustical ceiling removal is done and in the right showing a new orange peel drywall texture ready to paint.


In the left a remodel, a kitchen after the popcorn ceiling removal is done.
in the right the drywall texture orange peel is done ready to paint.




In the left drywall repair after drywall installation and in the right after the drywall texture is done, using skip trowel / hand texture and is ready to paint.


In the left picture you can see drywall repair after drywall
installation.
in the right picture you can see after the drywall texture is 
done using a skip trowel / hand texture and is ready to paint.




In the left a remodel, fixing the drywall patches because they installed different lights on the ceiling and in the right retexturing using skip trowel / hand texture and is ready to paint.

A picture in the left showing a remodel, fixing the drywall patches 
because they installed different lights on the ceiling
A picture in the right showing retexturing using skip trowel / hand 
texture and is ready to paint.




In the left a remodel, acoustical ceiling removal and drywall texture change from knock down drywall texture to skip trowel / hand texture, in the right the texture is done ready to paint.


In the left a remodel, acoustical ceiling removal and change 
from knock down to skip trowel/hand texture.
in the right texture is done ready to paint.




In the left installation of iso trax in the ceiling for better sound control and drywall texture change from knock down to skip trowel / hand texture, in the right drywall and texture done ready to paint.

In the left picture a remodel, texture change from knock down 
to skip trowel/hand texture and installation of iso trax in the ceiling for better sound control
in the right drywall installation and texture is done ready to 
paint.





In the left a condominium remodel, drywall texture change from knock down to skip trowel / hand texture and in the right the texture is done and is ready to paint.


In the left a condominium remodel, texture change from knock 
down drywall texture to skip trowel / hand texture
in the right the knock down drywall texture is done and is ready to 
paint.




In the left a condominium remodel, texture change from knock down to skip trowel / hand texture, and drywall patching around the new lights installed, in the right the texture is done and is ready for paint.

In the left a condominium remodel, texture change from drywall 
texture knock down to skip trowel / hand texture the owners installed new lights
in the right the drywall patching and knock down drywall texture 
are done and is ready to paint.





In the left a bathroom remodel, in the right after the framing, custom drywall textures and tile are done, ready for paint.



In the left a bathroom remodel, texture change from knock 
down to a custom drywall texture and framing of the ceiling
in the right the framing, drywall and custom texture are done and 
is ready to paint.




In the left and right everything was covered to Skim coat over the old knock down drywall texture in the ceiling to apply the new and most used texture here in the mountains the skip trowel drywall texture.


In the left a leaving room covered with plastic ready for
the custom drywall texture
in the right a leaving room covered with plastic ready for
the drywall texture skip trowel.





In the left after 2 skim coats in the whole ceiling, is ready for new texture, this ceiling was showing a lot of cracks due to setting down, in the right after everything was done looking brand new.


In the left after 2 skim coats in the whole ceiling, is 
ready for new texture.
in the right after everything was done looking brand new




In the left a kichen remodel doing some drywall patches, drywall taping and texture change from crows foot to orange peel drywall texture to match the living room, in the right ready to paint

In the left a kichen remodel showing some drywall holes where used 
to be the cabinets and a new wall
in the right after the drywall patching and drywall texture orange
peel was done looking brand new





In the left a restaurant after drywall installation and taping, in the right after knock down drywall texture, paint and the acoustical ceiling was done, almost ready to open.



In the left a restaurant showing the bare drywall after 
installation, and no ceilings
in the right after the drywall patching, drywall finishing 
drywall texture knock down and the acoustical ceiling was done almost ready to open




In the left a kitchen in a restaurant after the acoustical ceiling was done and in the right showing the ceiling tiles already installed.


In the left a kitchen in a restaurant showing the acoustical
ceiling after installation.
in the right after a kitchen in a restaurant showing 
the acoustical ceiling after the acoustical tiles have been installed





In the left Enterteinment center after its been framed and ready for drywall installation, in the right drywall already installed.



In the left a enterteinment center after its been framed showing
the bare studs.
in the right the enterteinment center after the drywall 
installation




Enterteinment center after its been framed, drywalled and textured using a custom drywall texture ready to paint, in one of these you can fit your big tvs., games and all kinds of toys.


showing a big entertainment center after its been framed, 
drywalled and textured ready to paint





In the left a media room framed using steel studs, in the right after drywall installation and ready for drywall taping.



In the left a media room been framed using steel studs
in the right media room already framed and drywall already
installed




In the left the same media room as above after drywall taping, drywall texture, painted and in the right everything was done.


In the left a media room after the drywall its been taped and
painted.
in the right the media room was done.





In the left doing drywall and texture repair and in the right the kitchen already painted.



In the left kitchen doing some drywal repair and retexture.
in the right after the drywall repair and already painted.




In the left a wall after drywall repair using drywall texture orange peel and it is ready for paint, in the right already painted using a different color.


In the left doing drywall repair and using the orange peel drywall 
texture in a wall
in the right after the drywall repair and already painted.





In the left water damage repair been done in a bathroom and in the right drywall repaired, finished and painted.



In the left doing drywall repair in a bathroom
in the right after the drywall its been repaired and already painted.




In the left walls and floors covered because the popcorn texture is going to be removed, in the right the popcorn ceiling removal is almost done.


In the left doing acoustical ceiling removal in a bedroom.
in the right after the popcorn texture removal is almost done.





In the left a kitchen without ceiling due to major water damage, in the right after the drywall intallation and drywall taping is done, ready to texture.



In the left a ceiling showing the bare studs due to major water damage.
in the right after drywall installation and drywall finishing is 
done ready to texture.




In the left a Basement being framed using steel studs, in the right after drywall installation and taping, ready for the drywall texture.


In the left basement been framed using steel studs.
in the right after drywall installation is done and is ready 
for the drywall texture.



picture showing drywall taping in a big room.



picture showing drywall finishing, taping in a big room.



picture showing drywall installation in a big room.



picture showing drywall installation in a big room.